Before Restoration

Before Restoration

The Job Begins

The Job Begins

Removing all existing

Removing all existing

Engine out for Rebuild

Engine out for Rebuild

Non existent ribs

Non existent ribs

Rotten Deck Shelf

Rotten Deck Shelf

Removing the Cabin

Removing the Cabin

Firring Bow Thruster

Firring Bow Thruster

Bow Thruster Tube

Bow Thruster Tube

Cockpit Framing

Cockpit Framing

Water Tank Bases

Water Tank Bases

New framing for cabin

New framing for cabin

Rebuilt 671 GM Engine

Rebuilt 671 GM Engine

Epoxy Shething cabin

Epoxy Shething cabin

New Cockpit

New Cockpit

Two Finish on Topsides

Two Finish on Topsides

New cabin

New cabin

Launching Day

Launching Day

In the Water

In the Water

Completed Restoration

Completed Restoration

Poppy

 

Gallery

Before Restoration
Before Restoration
The Job Begins
The Job Begins
Removing all existing
Removing all existing
Engine out for Rebuild
Engine out for Rebuild
Non existent ribs
Non existent ribs
Rotten Deck Shelf
Rotten Deck Shelf
Removing the Cabin
Removing the Cabin
Firring Bow Thruster
Firring Bow Thruster
Bow Thruster Tube
Bow Thruster Tube
Cockpit Framing
Cockpit Framing
Water Tank Bases
Water Tank Bases
New framing for cabin
New framing for cabin
Rebuilt 671 GM Engine
Rebuilt 671 GM Engine
Epoxy Shething cabin
Epoxy Shething cabin
New Cockpit
New Cockpit
Two Finish on Topsides
Two Finish on Topsides
New cabin
New cabin
Launching Day
Launching Day
In the Water
In the Water
Completed Restoration
Completed Restoration